PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Aligning the stone panels at the 2nd floor Facing East.jpg Block work at the Sally Ports Facing West.jpg Curtain wall Mullions delivery.jpg Exterior framing at the 2nd floor Facing West.jpg Exterior metal framing at the 2nd floor Facing West.jpg Installed sprinkler head at the 2nd floor Facing North.jpg Installing copper piping at the 4th floor Facing North.jpg Installing electrical split wire above the ceiling at the 2nd floor Facing West.jpg Installing Sprinkler main raiser at the 4th floor Facing North-East.jpg
Previous pageNext page Exterior metal framing at the 2nd floor Facing West
Exterior metal framing at the 2nd floor Facing West